Great Musgrave: infilled bridge a sad reflection on state of the industry
![]() |
Contents |
[edit] Introduction
ICE Fellow Judith Sykes said the infilling of a Victorian bridge with concrete emphasises the need for design principles to be part of a project's whole lifecycle. Skyes has described the infilling of a Victorian bridge in Cumbria as "shocking" and a "sad reflection" on the state of the industry.
[edit] Safety concerns
The Great Musgrave Bridge was infilled with hundreds of tonnes of concrete to "prevent further deterioration of the bridge from occurring and remove the associated risk of structural collapse”, according to the Government’s roads body, Highways England. The situation emphasised the timeliness of ICE's Design Report, published in July 2021.
“The recent images of the infilling of the arches in Cumbria are shocking,” said Judith Sykes, director of Expedition Engineering and member of ICE's 2020 State of the Nation steering group for the net zero emissions report.
"With all the advances in technology and engineering practice [since the bridge was built 159 years ago], the approach taken is a sad reflection on our industry. For so many reasons – carbon, waste, visual impact, ecology, future proofing – infilling with concrete is not the answer.
"We have to ask how the culture and practice of our sector enabled such an unthinking approach to repair of historic infrastructure," said Sykes.
[edit] Why whole-life design must be embedded
The bridge being infilled is an example of why design needs to be embedded throughout a project’s whole life, including at the repair and maintenance stages, Sykes said.
Sykes was appointed to The National Infrastructure Commission's (NIC) Design Group in 2019, which launched the Design Principles the same year to raise the level of understanding of how design and design thinking can create value, be climate responsive, enhance the lives of people and contribute to sense of place.
In 2021, ICE and the NIC conducted a survey to better understand how the civil engineering culture can deliver the design principles.
One of the key findings of the research was the need for business models that support better design outcomes. It also highlighted how much more work needs to be done to raise the profile of design at all stages of the project lifecycle.
Sykes said: “The repair and maintenance of our infrastructure assets will be critical to the UK’s mission to be net zero by 2050. Our mission is that all infrastructure companies and their supply chains will adopt the design principles and embed within business practice.”
“With the NIC’s call for design champions to be part of all projects from the end of the year, hopefully we will see an end to such disappointing solutions being implemented,” she added.
This article originally appeared on the news portion of the ICE website. It was written by Anh Nguyen and published on 10 August 2021.
--The Institution of Civil Engineers
[edit] Related articles on Designing Buildings Wiki
- Climate change is overlooked in infrastructure projects.
- Highways England.
- ICE articles on Designing Buildings Wiki.
- Project lifecycle for major road projects.
- Vision and validate: a third way in designing the roads of the future.
- Why demolition and infilling are blunt weapons in the management of historic structures.
[edit] External resources
Featured articles and news
Global Asbestos Awareness Week 2025
Highlighting the continuing threat to trades persons.
The context, schemes, standards, roles and relevance of the Building Safety Act.
Retrofit 25 – What's Stopping Us?
Exhibition Opens at The Building Centre.
Types of work to existing buildings
A simple circular economy wiki breakdown with further links.
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
The smart construction dashboard, as-built data and site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure Bill
An outline of the bill with a mix of reactions on potential impacts from IHBC, CIEEM, CIC, ACE and EIC.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.
Comments